Project Number
PW-24-09
Project Description
The goal of this project is to provide updates to the existing Devonshire Road sewer pump station. Work includes demolition, replacement, and installation of a backup electrical generator, two submersible chopper pumps, pump mounting equipment, instrumentation, control panels, electrical enclosures, concrete slabs; and all materials and equipment, construction, and services inherent to the Work.
Project Location
Devonshire Road
Project Updates
May 5, 2025
The project is currently out to bid. The bid opening is scheduled for May 28, 2025.
Roadway Closure/Detour Information
This information will be updated as needed during the construction phase of the project.
Anticipated Construction Dates
This section will be updated when this information is available.
Typical Work Hours
Monday to Friday from 7:00AM to 3:30PM, excluding holidays.
Contractor
The consultant for the design phase of this project is Woodard & Curran.
Project Photos
Construction photos will be shared here.