Devonshire Road Sewer Pump Station Improvement Project

Project Number

PW-24-09

Project Description

The goal of this project is to provide updates to the existing Devonshire Road sewer pump station. Work includes demolition, replacement, and installation of a backup electrical generator, two submersible chopper pumps, pump mounting equipment, instrumentation, control panels, electrical enclosures, concrete slabs; and all materials and equipment, construction, and services inherent to the Work.

Project Location

Devonshire Road

Project Updates

May 5, 2025

The project is currently out to bid. The bid opening is scheduled for May 28, 2025.

Roadway Closure/Detour Information

This information will be updated as needed during the construction phase of the project.

Anticipated Construction Dates

This section will be updated when this information is available. 

Typical Work Hours

Monday to Friday from 7:00AM to 3:30PM, excluding holidays.

Contractor

The consultant for the design phase of this project is Woodard & Curran. 