Victor Drive Water Main Replacement Project

Project NumberVictor Drive Water Main Replacement Project

PW-22-05

Project Description

This project involves upgrades to the water distribution system piping on Victor Drive.  The Contractor for this work is C.J.P. and Sons Construction Co., Inc. of Millis, MA. The upgrades include replacing the existing 8” cast iron water main with new 8” polyvinyl chloride (PVC) water main.  Water service connections between the new 8” PVC water main and the curb stop (valve typically located at the property line of each house) will also be replaced with new HDPE tubing (1” diameter in most locations). Existing fire hydrants and hydrant piping will be replaced with new hydrants.

Temporary Bypass Water Main is planned for use during this project.  There will be some water service interruptions that are necessary during this construction project. Notices will be distributed to affected households at least 48 hours in advance of the anticipated shutdowns.

Residents that have irrigation systems and/or electric dog fences located within the right-of-way are advised to mark out their location as soon as possible to prevent these systems from being damaged by excavation.  Please note that the Town is not responsible for any damages to these components installed within the Town’s right-of-way but we will make every effort to avoid damaging them if we are made aware of their presence in advance.

Project Location

Victor Drive

Anticipated Construction Dates

Work is anticipated to start around June 20, 2023 and is expected to be completed by the end of August 2023.

Typical Work Hours

Monday to Friday from 7:00AM to 3:30PM excluding Town observed holidays.

Roadway Closure/Detour Information

Road closures are not anticipated as part of this project due to the lack of potential detour routes.  One-lane two-way alternating traffic is expected.  Delays should be expected and motorists are advised to plan ahead for these delays when travelling on Victor Drive.

Trash collection and mail/package delivery vehicles are not anticipated to be impacted by this project.

Project Updates

June 13, 2023

Project updates will be posted here as they become available.

Contractor

The contractor for this project is C.J.P. and Sons Construction Co., Inc of Millis, Massachusetts.

Project Contacts

If you have any questions, please contact Andrew Stack, Town Engineer at (978) 640-4440 x256 or astack@tewksbury-ma.gov.

Project Documents

Victor Drive Work Zone (PDF)