School Street Water Main Replacement Project

Project Number

PW-22-27

Project Description

This project involves replacement of the existing 2” cast iron and 2” plastic water main with a new 8” ductile iron water main, new HDPE water service connections, new fire hydrants, and new valves.  This new water main will provide increased structural integrity, greater flow capacity, and increased fire protection capabilities.School Street Construction Photo

Project Location

The project area includes School Street, Bell Road, and Cottage Street.

School Street Locus Map

Anticipated Construction Dates

Work is anticipated to begin in mid-to-late July 2022.  Once excavation work begins, it is anticipated to take approximately three weeks to complete construction.

Typical Work Hours

Work hours are typically Monday to Friday from 7:00AM to 3:30PM excluding holidays.

Roadway Closure/Detour Information

Depending on where the work zone is located each day, residents may need to access their residences from either the South Street end or the Glenwood Road end of School Street due to daily roadway closures during construction hours.  Franklin Street or State Street can be utilized as a detour route during construction.  Roadway closure signs will be posted, and police details will be on-site during construction hours.

Project Updates

Project Updates will be posted here once work begins.

Contractor

Cedrone Trucking, Inc. of Billerica, MA

Project Contacts

Andrew Stack, Project Manager, Tewksbury DPW (978) 640-4440 x256 astack@tewksbury-ma.gov